[PDF] Net Metering – Rate Schedule 77 – Rate 21

[PDF] Net Metering – Rate Schedule 77 – Rate 21
  • Ver­sion 03-01-2025
  • File Size 114 KB
  • File Count 1
  • Cre­ate Date March 1, 2025
  • Last Updat­ed March 19, 2025
  • Down­load PDF

 

Avail­able to indi­vid­ual large com­mer­cial mem­bers with a required trans­former capac­i­ty exceed­ing 50 KVA who own and oper­ate a solar pho­to­volta­ic, wind-pow­ered, bio­mass-fueled, micro-hydro gen­er­at­ing sys­tem or oth­er Coop­er­a­tive-approved renew­able gen­er­a­tion source of elec­tric ener­gy (“Eli­gi­ble Gen­er­a­tion Source”) installed on the Member’s side of the deliv­ery point of the Member’s pri­ma­ry legal res­i­dence, for the Member’s own use, where a part or all of the elec­tri­cal require­ments of the mem­ber can be sup­plied from the member’s gen­er­at­ing sys­tem but inter­con­nect­ed with and oper­at­ed in par­al­lel with the Cooperative’s dis­tri­b­u­tion sys­tem.