![[PDF] Net Metering – Rate Schedule 73 – Rate 3](https://www.yorkelectric.net/wp-content/uploads/2019-05-bylaws-graphic-600w.jpg)
- Version 03-01-2025
- File Size 97 KB
- File Count 1
- Create Date March 1, 2025
- Last Updated March 19, 2025
- Download PDF
Available to residential members in private residences, mobile homes, or farms not qualifying for Residential All-Electric (Rate Code 5) service (but meeting the water heating requirements as stated below) who own and operate a solar photovoltaic, wind-powered, biomass-fueled, micro-hydro generating system or other Cooperative-approved renewable generation source of electric energy (“Eligible Generation Source”) installed on the Member’s side of the delivery point of the Member’s primary legal residence, for the Member’s own use, where a part or all of the electrical requirements of the member can be supplied from the member’s generating system but interconnected with and operated in parallel with the Cooperative’s distribution system.