[PDF] Large Commercial Net Metering – Rate Schedule 57 – Rate 21

[PDF] Large Commercial Net Metering – Rate Schedule 57 – Rate 21
  • Ver­sion 2021-01
  • File Size 103 KB
  • File Count 1
  • Cre­ate Date Jan­u­ary 1, 2021
  • Last Updat­ed Jan­u­ary 2, 2021
  • Down­load PDF

 

Avail­able to indi­vid­ual large com­mer­cial mem­bers with a required trans­former capac­i­ty exceed­ing 50 KVA who own and oper­ate a solar pho­to­volta­ic, wind-pow­ered, bio­mass-fueled, or micro-hydro gen­er­at­ing sys­tem, locat­ed and used at the mem­ber’s busi­ness where a part or all of the elec­tri­cal require­ments of the mem­ber can be sup­plied from the mem­ber’s gen­er­at­ing sys­tem.