[PDF] Green Power: Summer 2017

[PDF] Green Power: Summer 2017
  • Ver­sion
  • File Size 681 KB
  • File Count 1
  • Cre­ate Date Sep­tem­ber 20, 2017
  • Last Updat­ed Sep­tem­ber 20, 2017
  • Down­load PDF

Darlington Raceway Earns its Green Stripe

When it comes to renew­able ener­gy, the Dar­ling­ton Race­way earned its “Green Stripe” this past Labor Day week­end, once again pow­er­ing its major NASCAR events with 100 per­cent renew­able ener­gy sup­plied by Green Pow­er. Dis­trib­uted by Pee Dee Elec­tric Coop­er­a­tive and gen­er­at­ed by state-owned util­i­ty San­tee Coop­er, Green Pow­er fueled all of the elec­tri­cal needs of the NASCAR XFINITY Series Sport Clips Hair­cuts VFW 200 and the Mon­ster Ener­gy NASCAR Cup Series Bojan­gles’ South­ern 500.